The actions proposed are basically those of earthmoving, for the removal of the existing concrete pavement, and the new paving of the streets with sulfur-resistant concrete, both with swollen surface finish and with the finish to the aggregate seen, according to description to the report and graphic documentation of the project. The approximate surface area of ​​the streets is 1,055.95m2. It is also working on the arrangement of the stairs of the Era del Jaumet, Carrer del Collet and Carrer del Pla, providing them with new paving and lighting and sewerage installations, the latter to those of the street of the Plan. (EXPIRED)